Waterproofing Contractor: Mana Sanat Bonyan

Objective: waterproofing of excavation

Case of Activity: Consulting, Technical Designing, Procurement and Installation of Waterproofing System

Excavation Floor Area: 1000 m² 

Excavation Wall Area: 2500 m²

Excavation Depth: 17 m

Stabilization System: Nailing

Designing and Installation of Waterproofing System:

  • Installation of Dimple Sheet Drainage Layer on vertical surfaces
  • Installation of GCL Waterproofing Layer
  • Using Sodium Bentonite Powder in overlap areas
  • CATEGORY