Waterproofing Contractor: Mana Sanat Bonyan

Objective: waterproofing of excavation

Case of Activity: Consulting, Technical Designing, Procurement and Installation of Waterproofing System

Excavation Floor : 1035 m²

Excavation Wall Area: 15300 m²

Excavation Depth: 30 m

Stabilization System: Nailing

Designing and Installation of Waterproofing System:

       – Installation of GCL Waterproofing Layer

       – Using Sodium Bentonite Powder in overlap areas