Waterproofing Contractor: Mana Sanat Bonyan
Objective: waterproofing of excavation
Case of Activity: Consulting, Technical Designing, Procurement and Installation of Waterproofing System
Excavation Floor : 1035 m²
Excavation Wall Area: 15300 m²
Excavation Depth: 30 m
Stabilization System: Nailing
Designing and Installation of Waterproofing System:
– Installation of GCL Waterproofing Layer
– Using Sodium Bentonite Powder in overlap areas