Client: Pey Kharid Novin Aria Company
Consultant: UA+ Consulting Engineers
Main Contractor: Borj Avaran investment Company
Waterproofing Contractor: Mana Sanat Bonyan
Objective: waterproofing of excavation
Case of Activity: Consulting, Technical Designing, Procurement and Installation of Waterproofing System
Excavation Floor Area: 5000 m²
Excavation Wall Area: 7000 m²
Excavation Depth: 27 m
Stabilization System: Nailing
Designing and Installation of Waterproofing System:
- Installation of GCL Waterproofing Layer
- Using Sodium Bentonite Powder in overlap areas
- Installation of LLDPE Waterproofing Layer
- Installation of Geotextile Protective Layer
- CATEGORY