Consultant: Sharestaan Consulting Engineers Company

Waterproofing Contractor: Mana Sanat Bonyan

Objective: waterproofing of excavation

Case of Activity: Consulting, Technical Designing, Procurement and Installation of Waterproofing System

Excavation Floor Area: 3000 m²

Excavation Wall Area: 6000 m²

Excavation Depth: 26 m

Stabilization System: Nailing

Designing and Installation of Waterproofing System:

  • Installation of Dimple Sheet Drainage Layer on vertical surfaces
  • Installation of GCL Waterproofing Layer
  • Using Sodium Bentonite Powder in overlap areas
  • Installation of HDPE Waterproofing Layer
  • Installation of Geotextile Protective Layer

  • CATEGORY