Consultant: Sharestaan Consulting Engineers Company
Waterproofing Contractor: Mana Sanat Bonyan
Objective: waterproofing of excavation
Case of Activity: Consulting, Technical Designing, Procurement and Installation of Waterproofing System
Excavation Floor Area: 3000 m²
Excavation Wall Area: 6000 m²
Excavation Depth: 26 m
Stabilization System: Nailing
Designing and Installation of Waterproofing System:
- Installation of Dimple Sheet Drainage Layer on vertical surfaces
- Installation of GCL Waterproofing Layer
- Using Sodium Bentonite Powder in overlap areas
- Installation of HDPE Waterproofing Layer
- Installation of Geotextile Protective Layer