Client: Sinam Consulting Engineers Company
Main Contractor: Omran Maroon Company
Waterproofing Contractor: Mana Sanat Bonyan
Objective: waterproofing of excavation
Case of Activity: Consulting, Technical Designing, Procurement and Installation of Waterproofing System
Groundwater Level: -18 m
Excavation Floor Area: 8,000 m²
Excavation Wall Area: 17,000 m²
Excavation Depth: 36 m
Stabilization System: Nailing
Designing and Installation of Waterproofing System:
– Installation of Dimple Sheet Drainage Layer
– Installation of GCL Waterproofing Layer
– Using Sodium Bentonite Powder in overlap areas
– Installation of VLDPE Waterproofing Layer