Waterproofing Contractor: Mana Sanat Bonyan
Objective: waterproofing of excavation
Case of Activity: Consulting, Technical Designing, Procurement and Installation of Waterproofing System
Groundwater Level: -10.2 m
Excavation Floor Area: 218 m²
Excavation Wall Area: 535 m²
Excavation Depth: 9.2 m
Stabilization System: Soldier Pile / 42 Micro piles in floor area
Designing and Installation of Waterproofing System:
- Installation of GCL Waterproofing Layer
- Using Sodium Bentonite Powder in overlap areas
- Installation of VLDPE Waterproofing Layer
- Installation of Geotextile Protective Layer
- CATEGORY