Waterproofing Contractor: Mana Sanat Bonyan

Objective: waterproofing of excavation

Case of Activity: Consulting, Technical Designing, Procurement and Installation of Waterproofing System

Groundwater Level: -10.2 m

Excavation Floor Area: 218 m²

Excavation Wall Area: 535 m²

Excavation Depth: 9.2 m

Stabilization System: Soldier Pile / 42 Micro piles in floor area

Designing and Installation of Waterproofing System:

  • Installation of GCL Waterproofing Layer
  • Using Sodium Bentonite Powder in overlap areas
  • Installation of VLDPE Waterproofing Layer
  • Installation of Geotextile Protective Layer

  • CATEGORY